Dworzec Gdański station
line M1
Dworzec Gdański station — what to know

Dworzec Gdański, opened on 20 December 2003, is one of only two stations on line M1 with a direct rail connection. Warszawa Gdańska railway station, served by the SKM commuter network, lies about 200 metres from the exit. The metro platform sits roughly 11.5 metres underground and the station covers just under 6,900 square metres. Above it runs one of the largest tram junctions in the city, tying Żoliborz, Muranów and Praga together.
First and last train from Dworzec Gdański
| Day | M1 → Kabaty | M1 → Młociny |
|---|---|---|
| Monday – Thursday | 05:12 – 00:21 | 05:27 – 00:30 |
| Friday | 05:12 – 02:30 | 05:27 – 02:24 |
| Saturday | 05:12 – 02:30 | 05:27 – 02:24 |
| Sunday and holidays | 05:12 – 00:20 | 05:27 – 00:32 |
These are departures from Dworzec Gdański, not from the terminus. On Friday and Saturday nights the metro runs later — you can see it in those two rows.
How often trains run (weekday)
- 05:12 – 06:02every 4.5 min
- 06:02 – 09:35every 2.5 min
- 09:35 – 14:07every 3.5 min
- 14:07 – 20:14every 2.5 min
- 20:14 – 21:15every 4.5 min
- 21:15 – 22:33every 6.5 min
- 22:33 – 22:56every 7.5 min
- 22:56 – 00:24every 9.5 min
- 05:27 – 06:00every 6 min
- 06:00 – 06:15every 3.5 min
- 06:15 – 09:13every 2.5 min
- 09:13 – 13:52every 3.5 min
- 13:52 – 19:47every 2.5 min
- 19:47 – 21:21every 5 min
- 21:21 – 22:36every 6.5 min
- 22:36 – 00:33every 9.5 min
Around Dworzec Gdański station
Transfers and surface transport
Taken from the ZTM timetable: these are the routes calling at stops named Dw. Gdański. Route numbers do change — check the current timetable before you travel.
Station services
Dworzec Gdański station in numbers
| Detail | Value |
|---|---|
| M1 platform opened | 20 December 2003 |
| District | Śródmieście |
| Platform depth | 11.5 m |
| Platform length | 120 m |
| Platform width | 12 m |
| Floor area | 6,864 m² |
| Dworzec Gdański → Plac Wilsona | 3 min running time · about 1,463 m |
| Dworzec Gdański → Ratusz Arsenał | 3 min running time · about 1,534 m |
| Step-free access | Yes — every station on the Warsaw Metro has lifts |
| Fare zone | Zone 1 |
Other stations on line M1
Frequently asked questions — Dworzec Gdański station
Monday to Thursday, towards Kabaty (M1) the first train is at 05:12 and the last at 00:21; towards Młociny (M1) the first train is at 05:27 and the last at 00:30. On Friday and Saturday the metro runs later — the last trains from Dworzec Gdański then leave at 02:30 (M1 → Kabaty) and 02:24 (M1 → Młociny). These times come from the ZTM timetable and are departures from this station, not from the terminus.
On a weekday, gaps between trains on line M1 range from 2.5 min at peak to 9.5 min late in the evening. Services are less frequent at weekends. The full breakdown for each direction is in the table above.
The station opened on 20 December 2003 as part of line M1. The platform lies about 11.5 metres below ground.
Stops named Dw. Gdański are served by: trams 1, 6, 9, 15, 19, 20, 26, 28, 36, 73, 76; daytime buses 116, 157, 409, 500, 518; night buses N12, N44, N62; SKM commuter rail (Warszawa Gdańska). The list comes from the ZTM timetable and covers only routes that actually call at this station.
It is the 7th of 21 stations on line M1. The adjacent stations are Plac Wilsona and Ratusz Arsenał. Running time: Plac Wilsona — 3 min; Ratusz Arsenał — 3 min.
Yes. Every station on the Warsaw Metro has lifts between street level and the platform, and the platforms have tactile markings. We do not list the number or location of individual exits: Metro Warszawskie does not publish them in a consistent form, and guessing would be unfair to anyone planning a journey in advance.
- ZTM Warsaw timetable (Warsaw Public Transport GTFS feed)
- Zarząd Transportu Miejskiego w Warszawie — owner of the timetable data
- Metro Warszawskie Sp. z o.o. — operator of lines M1 and M2
- Wikipedia (pl) — station technical data and opening dates