Dworzec Wileński station
line M2
Dworzec Wileński station — what to know

Dworzec Wileński is the main hub of right-bank Warsaw. The metro station has been running since 8 March 2015, covers more than 18,500 square metres and lies about 13 metres down. Above it sit Warszawa Wileńska railway station and one of the largest tram junctions in the city, where more than a dozen routes tie Praga, Targówek and Bródno to the centre. For the first four years of line M2 this was where the line ended.
First and last train from Dworzec Wileński
| Day | M2 → Bemowo | M2 → Bródno |
|---|---|---|
| Monday – Thursday | 05:12 – 00:21 | 05:21 – 00:37 |
| Friday | 05:12 – 02:20 | 05:21 – 02:34 |
| Saturday | 05:12 – 02:20 | 05:21 – 02:34 |
| Sunday and holidays | 05:12 – 00:18 | 05:21 – 00:32 |
These are departures from Dworzec Wileński, not from the terminus. On Friday and Saturday nights the metro runs later — you can see it in those two rows.
How often trains run (weekday)
- 05:12 – 05:43every 8 min
- 05:43 – 07:11every 4.5 min
- 07:11 – 09:44every 3 min
- 09:44 – 14:36every 4.5 min
- 14:36 – 19:42every 3 min
- 19:42 – 20:54every 5 min
- 20:54 – 00:25every 9 min
- 05:21 – 06:20every 6.5 min
- 06:20 – 06:43every 4.5 min
- 06:43 – 09:41every 3 min
- 09:41 – 14:42every 7.5 min
- 14:42 – 19:22every 3 min
- 19:22 – 20:31every 4.5 min
- 20:31 – 23:12every 6.5 min
- 23:12 – 00:39every 9.5 min
Around Dworzec Wileński station
Transfers and surface transport
Taken from the ZTM timetable: these are the routes calling at stops named Dw. Wileński. Route numbers do change — check the current timetable before you travel.
Station services
Dworzec Wileński station in numbers
| Detail | Value |
|---|---|
| M2 platform opened | 8 March 2015 |
| District | Praga-Północ |
| Platform depth | 13 m |
| Platform length | 120 m |
| Platform width | 11 m |
| Floor area | 18,512 m² |
| Platforms | 1 |
| Platform faces | 2 |
| Dworzec Wileński → Stadion Narodowy | 2 min running time · about 957 m |
| Dworzec Wileński → Szwedzka | 2 min running time · about 1,255 m |
| Step-free access | Yes — every station on the Warsaw Metro has lifts |
| Fare zone | Zone 1 |
Other stations on line M2
Frequently asked questions — Dworzec Wileński station
Monday to Thursday, towards Bemowo (M2) the first train is at 05:12 and the last at 00:21; towards Bródno (M2) the first train is at 05:21 and the last at 00:37. On Friday and Saturday the metro runs later — the last trains from Dworzec Wileński then leave at 02:20 (M2 → Bemowo) and 02:34 (M2 → Bródno). These times come from the ZTM timetable and are departures from this station, not from the terminus.
On a weekday, gaps between trains on line M2 range from 3 min at peak to 9 min late in the evening. Services are less frequent at weekends. The full breakdown for each direction is in the table above.
The station opened on 8 March 2015 as part of line M2. The platform lies about 13 metres below ground.
Stops named Dw. Wileński are served by: trams 1, 3, 4, 6, 13, 18, 19, 20, 23, 25, 26, 28, 73, 76; daytime buses 100, 120, 135, 160, 162, 166, 169, 170, 190, 338, 509, 512; night buses N02, N03, N11, N14, N16, N21, N61, N64, N71. The list comes from the ZTM timetable and covers only routes that actually call at this station.
It is the 12th of 18 stations on line M2. The adjacent stations are Stadion Narodowy and Szwedzka. Running time: Stadion Narodowy — 2 min; Szwedzka — 2 min.
Yes. Every station on the Warsaw Metro has lifts between street level and the platform, and the platforms have tactile markings. We do not list the number or location of individual exits: Metro Warszawskie does not publish them in a consistent form, and guessing would be unfair to anyone planning a journey in advance.
- ZTM Warsaw timetable (Warsaw Public Transport GTFS feed)
- Zarząd Transportu Miejskiego w Warszawie — owner of the timetable data
- Metro Warszawskie Sp. z o.o. — operator of lines M1 and M2
- Wikipedia (pl) — station technical data and opening dates